Official PPG Sigma distribution • Poland and Europe+48 533 220 562 · handlowy@marfarb.pl

Technical guide

How to prepare concrete before painting

A coating on concrete is only as durable as the substrate layer to which it adheres. Concrete should be cured, sound, clean, sufficiently dry and free of weak laitance.

Assess concrete condition and curing

New concrete needs time to cure. Check minimum age and permitted moisture in the documentation for the selected system. Substrate strength, cracks, defects and the possibility of rising moisture from below must also be assessed.

Remove the weak layer

Laitance, old coatings, contamination and poorly cohesive material are removed mechanically: depending on the facility, by shot blasting, milling, grinding or another approved method. The aim is to expose a strong, uniformly open substrate.

Cleaning and repairs

Thoroughly remove dust and grease. Repair defects and cracks using compatible material. Joints, edges and service penetrations need particular attention: a coating does not replace a structural repair design.

  • check moisture
  • verify substrate soundness
  • remove dust and contamination
  • repair defects with compatible material
  • select the correct primer

Test before starting work

On larger projects, it is worthwhile preparing a trial area and measuring adhesion. This confirms the preparation method and identifies moisture or contamination problems before the full surface is coated.

Need a specific system?

Describe your project and exposure conditions.

We will help select PPG Sigma products and estimate the required quantity.

Send an enquiry